Asphalt Shoulder Replacements

Road Bond

Asphalt Paving Project

Project Description:

This project involves the removal and replacement of existing asphalt pavement to restore the surface and structural integrity of the roadway shoulder. Work includes milling the existing asphalt shoulder surface, repairing any damaged base, as needed, and installing new hot mix asphalt. The goal is to improve quality, drainage and longevity of the asphalt shoulder pavement. All work will be completed in phases by road to minimize disruption and ensure safe access throughout the duration of the project.

Project Information:

  • Cochran’s Crossing
  • Flintridge Drive
  • Kuykendahl Road
  • North Panther Creek Drive
  • North Millbend Drive
  • South Millbend Drive
  • Grogan’s Mill Road
  • Woodlands Parkway
  • Research Forest Drive

Completion:  Fall 2025

Intersection Improvement Projects

Road Bond

Research Forest Drive at Gosling Road Intersection Improvements

Scope: Extend existing turn lanes to create more vehicle storage and improve mobility and safety for turn lanes and through lanes.

  • Extend dual left-turn lanes from westbound Research Forest Drive onto southbound Gosling Road
  • Extend dual left-turn lanes from southbound Gosling Road onto eastbound Research Forest Drive
  • Extend dual left-turn lanes from northbound Gosling Road to westbound Research Forest Drive

Phase: Started engineering design

Estimated Design Cost: $25,500

Timeline: Engineering design expected to be completed by end of summer

Road Bond

Research Forest Drive at Greenbridge Drive Turn-Lane Extension

Scope: Extend and widen left-turn lane from eastbound Research Forest Drive onto northbound Greenbridge Drive to improve mobility and safety for turn lane and through lanes.

Phase: Started engineering design

Estimated Design Cost: $10,500

Timeline: Engineering design expected to be completed by end of summer

Road Bond

Lake Woodlands Drive at Gosling Road Intersection Improvements

Scope: Extend turn lanes to create improve mobility and safety for turn lanes and through lanes

  • Extend left-turn lane from eastbound Lake Woodlands Drive onto northbound Gosling Road
  • Extend dual left-turn lanes from westbound Lake Woodlands Drive onto southbound Gosling Road

Phase: Started engineering design

Estimated Design Cost: $40,000

Timeline: Engineering design expected to be completed in fall

Road Bond

Lake Woodlands Drive at East Panther Creek Drive Turn-Lane Extension

Scope: Extend left-turn lane from westbound Lake Woodlands Drive onto southbound East Panther Creek Drive

Phase: Started engineering design

Estimated Design Cost: $22,500

Timeline: Engineering design expected to be completed in fall

Road Bond

Grogan’s Mill Road at Research Forest Drive right-turn improvements

Scope: Extend right-turn lane and/or add second right-turn lane from northbound Grogan’s Mill Road onto eastbound Research Forest Drive

Phase: Started engineering design

Estimated Design Cost: $50,000

Timeline: Engineering design expected to be completed in fall

Road Bond

Grogan’s Mill Road at Lake Woodlands Drive at Turn-Lane Extension

Scope: Extend left-turn lane to median opening on northbound Grogan’s Mill Rd turning onto westbound Lake Woodlands Drive

Phase: Started engineering design

Estimated Design Cost: $22,500

Timeline: Engineering design expected to be completed in fall

Road Bond

Rayford Road at East Benders Landing Drive Intersection

Scope: Widen asphalt pavement on Rayford Road past intersection to create merge lane for vehicles leaving Benders Landing Estates

Estimated Design Cost: Just under $38,318 total for construction and striping

Timeline: Project completed